Design visit — today
We measure, choose your look, and reserve your install.
A conversation at your table
Three solid wall panels. A new pan. Installed by a licensed California contractor.
Today: your look, then your price.
Illustration — actual stone varies
Tap what matters. We’ll come back to this at the price.
You can change these any time.
Before
After
No grout to scrub · An easier step-in · A finished look
Is this the change you’ve been wanting?
Licensed California contractor #889066. Local to Danville — 595 San Ramon Valley Blvd. One project manager, start to finish. You’ll see and touch your actual slab before anything is ordered.
Illustration — actual stone varies
We measure, choose your look, and reserve your install.
Your project manager confirms every measurement.
You approve the actual slab before anything is ordered.
If a permit is required, we handle the paperwork. Permit fees, if any, are extra.
Work begins once everything is on site.
We walk the finished shower with you.
Illustration — actual stone varies
A curtain rod is included. Choose a glass door if you want a more finished look. A hinged door is priced on your quote.
Style examples — the walls shown are illustrations; your stone is chosen on the next pages.
Tap to change a choice. The large photo is always your wall. Door, niche, and finish previews are style examples.
Illustration — actual stone varies
Is this the shower you want?
The shower is designed. Tap to add anything else you’d like. You can change these later.
Illustrations. Starting prices from our current list. Larger floors ($40 / sq ft) and other work are priced on your quote.
This is today’s starting price for the shower we just designed.
What’s included
$1,000 today holds your place on the schedule. Your project manager confirms final measurements; hidden damage, mold, code upgrades and permits (if needed) are extra.
California law caps a home-improvement deposit at $1,000 or 10%, whichever is less.
These are starting prices. Hidden damage, mold, code upgrades and permits (if needed) are extra. Work begins once all your materials are on site. You’ll receive your written contract with your cancellation rights.
Your shower
Next: we confirm measurements, and you approve the actual slab before anything is ordered.
$1,000 holds your place. Hidden damage, mold, code upgrades and permits (if needed) are extra. You’ll receive your written contract with your cancellation rights.
Illustration — actual stone varies
The shower we just designed is a New Shower. These are the other starting prices from our current list, if your project is different.
| Project | Starting price |
|---|---|
| New ShowerDemo & haul-away, new pan, solid wall panels, mixing valve & trim + fixed head, curtain rod, all labor. Chrome, brushed nickel or matte black included. | $12,000 |
| Tub-to-Shower ConversionEverything in a New Shower, plus the tub removed and the drain changed from 1½″ to 2″. Hard drain access may cost more. | $13,000 |
| Small Full BathroomNew shower as above, plus we set a toilet, vanity, sink and mirror that you supply. | $15,000 |
| Bigger / Primary BathroomQuoted after a walkthrough of the space. | Quote |
These are starting prices. Hidden damage, mold, code upgrades and permits (if needed) are extra. Work begins once all your materials are on site. Sliding door +$1,800. Frameless glass door +$3,200. Grab bar +$300 each. Fold-down seat +$650. Handheld shower + slide bar +$450. Recessed niche +$750. Vanity + top + faucet +$3,500. Toilet +$1,000. Mirror / medicine cabinet +$500. Vanity light +$500 each. Small bath floor (up to 40 sq ft) +$1,800. Floor, larger rooms $40 / sq ft. Exhaust fan +$750. Paint bathroom +$900.
Design and sales by Mark. Construction by CDU-INC (Construction and Design by United), license #889066. 595 San Ramon Valley Blvd, Danville, CA. Mark (925) 786-0041.